Winter has been a trial at best.
The chooks are well into their routine, and we have an over-supply egg issue rather than nothing. This is resolved with scrambled eggs and I like a hard boiled one or three occasionally, so that works out.
The shepherd has had a hard time of it though. Her ears have been soggy all winter, and only started drying up in the heat now.
The tax refund will get the car fixed, and then it's back to collecting stuff to finish all those little jobs around the place, like the slabbing and edging and making roofs for the little beds for summer.
Oh, and ripping up and re-installing all the retic. Yeas, now there's a job that should be fun........
Sunday, September 11, 2011
Saturday, January 29, 2011
Where is my pina-colada?!
The non-work agreement lasted about 4 days.
Then I had a day off, and it was decided that we would do lots of little niggling jobs around the place. Things like drilling in pallings, touch-up painting, re-potting the geranium, stuff that should have been easy.
Naturally, it all got veeeeeery complicated for some reason. Best moment of the day - re-attaching the roof side-wall, to discover a small colony of paper wasps. Wasps now dead, wall firmly fixed in place, and we need a new can of spray.
I thought I'd get out of things by having the next day to work. Oh no! Because I didn't start until midday, the PIC decided we'd duck out and grab a load of 40 slabs (those big heavy cement things). This plan should have worked. The salvage yard opens at 8am, we lead up, go home, dump first load, go back and load next 20, home and dump, then pack up and we're inside relaxing by 10am.
Except the usual counter girl is on holidays, and the yard didn't open until 9am, after we'd been waiting for an hour.
It was 1130 before the final slab was piled up, which left me about 45 minutes to relax, shower, scoff something to eat, get ready, and get to work.
Isn't life fun, kiddies?
Then I had a day off, and it was decided that we would do lots of little niggling jobs around the place. Things like drilling in pallings, touch-up painting, re-potting the geranium, stuff that should have been easy.
Naturally, it all got veeeeeery complicated for some reason. Best moment of the day - re-attaching the roof side-wall, to discover a small colony of paper wasps. Wasps now dead, wall firmly fixed in place, and we need a new can of spray.
I thought I'd get out of things by having the next day to work. Oh no! Because I didn't start until midday, the PIC decided we'd duck out and grab a load of 40 slabs (those big heavy cement things). This plan should have worked. The salvage yard opens at 8am, we lead up, go home, dump first load, go back and load next 20, home and dump, then pack up and we're inside relaxing by 10am.
Except the usual counter girl is on holidays, and the yard didn't open until 9am, after we'd been waiting for an hour.
It was 1130 before the final slab was piled up, which left me about 45 minutes to relax, shower, scoff something to eat, get ready, and get to work.
Isn't life fun, kiddies?
Friday, January 21, 2011
Fence fall down calamity
So, with the coop finally finished, we were planning a bit of a rest before the next bit. Then karma landed a large gate on us when the side fence fell down.
Note: This is not you usual 2 poles in a ground latch metal gate. No, this is an escape-proof dog gate about 8ft high and heavy.
So, Pete goes into overdrive. No just driving stakes into the ground for us, oh no - we dig holes, pour cement, let it dry for 2 day, the re-hinge the gate, tie off strainers so it won't fall down again, drill and tie in place, and finally create a new locking system.
We started at 6:30 Friday morning. It was 2235 when the last tool was put away and the humans finally got to rest.
There is now a refusal to do any more hard work for at least 2 weeks. We're both dead.
The gate works like a charm
Note: This is not you usual 2 poles in a ground latch metal gate. No, this is an escape-proof dog gate about 8ft high and heavy.
So, Pete goes into overdrive. No just driving stakes into the ground for us, oh no - we dig holes, pour cement, let it dry for 2 day, the re-hinge the gate, tie off strainers so it won't fall down again, drill and tie in place, and finally create a new locking system.
We started at 6:30 Friday morning. It was 2235 when the last tool was put away and the humans finally got to rest.
There is now a refusal to do any more hard work for at least 2 weeks. We're both dead.
The gate works like a charm
Wednesday, January 5, 2011
A herb garden at last!
So, the apricot bed has been divided up and lots of little herb beds made. I wasn't able to convince the PIC that the mint should go out as well, but as the strawberries were planted, I now have 2 nice long plant holders that will do for them.
However -- I do not suggest that people do all this work in 45 - 50 degree days. And yes, it was that hot. We had the thermometer outside with us. It actually got to 55 on Tuesday, and it just about killed us.
However, herbs all planted, bed looking nice, lots of growing soil in, and now it's on with the erecting of the chook yard tomorrow. Provided it doesn't rain again.
However -- I do not suggest that people do all this work in 45 - 50 degree days. And yes, it was that hot. We had the thermometer outside with us. It actually got to 55 on Tuesday, and it just about killed us.
However, herbs all planted, bed looking nice, lots of growing soil in, and now it's on with the erecting of the chook yard tomorrow. Provided it doesn't rain again.
Subscribe to:
Posts (Atom)
